132 kV

TERNA substation

2 x 25MVA

Power transformers

Latec S.r.l. delivered the turnkey construction of a 132 kV double-busbar electrical substation, fully compliant with TERNA standards, located in the municipality of Canaro, in the province of Rovigo. The project also included the construction of a user station equipped with 25 MVA transformers, designed to connect a 48 MW photovoltaic plant to the national high-voltage grid.

The scope of work covered the design, supply, installation, and commissioning of all electromechanical and automation systems, ensuring high standards of reliability, safety, and operational continuity.

The infrastructure enables the full integration of renewable energy generated by the photovoltaic power plant, supporting the decarbonization of the electrical system and contributing to national energy transition targets.

This project represents a concrete example of Latec S.r.l.’s expertise in the construction of high-voltage electrical substations and grid connection solutions for renewable energy plants.